Baxter Health Care

BAXTER project

Crosbie Group were appointed to deliver the Refrigeration and Air-conditioning Contract for the new refurb in Sandyford.

The project consisted a full design and fitout by crosbie.

 

SCOPE OF WORKS

– Coldroom

– Electrical

– Incubator rooms

– AHU

– VRV Daikin systems

– VRV Daikin indoor units

– VRV Daikin Dx for AHU

– Design

– Tested, commissioned, validated and demonstrated

Recent Projects

SuperValu Dunboyne

Super dunboyne building

Crosbie Group were appointed to deliver the Refrigeration and electrical Contract for the new Co2 installation in this new store. The project consisted a full design to keep the new site green and clean with Co2 R744 Refrigerant to reduce there cardon footprint.

 

– Chill Coldroom

– Electrical

– Chill Multi decks

– Co2 plant

– Co2 leak detection

– Danfoss front end

– Danfoss network

– Freezer cold rooms

– Multi plex

– Drainage

– Serve over cases

– Tested, commissioned, validated and demonstrated

Recent Projects

Indeed Head office Capital Dock

Indeed office

Crosbie Group won this project for Air-conditioning contract on a tender stage through main mechanical contractor,

Number of split systems across 8 storey office block servicing IDF and MDF rooms with 100 % and change over,

VRV systems on ground floor serving gym area

 

Scope

– Air-conditioning split systems

– Under ceiling Daikin Indoor units

– Drip pans

– Leak detection

– Control wiring

– Condensate

– VRV Daikin outdoor unit

– VRV Daikin indoor unit

– Central controlled

– BMS

– Tested, commissioned, validated and demonstrated

Recent Projects

Centra Ballinter

shop Ballinter

Crosbie Group were appointed to deliver the Refrigeration and Air-conditioning Contract for the new Co2 installation in this new store. The project consisted a full design to keep the new site green and clean with Co2 R744 Refrigerant to reduce there carbon foot print .

 

– Chill Coldroom Monoblock

– Electrical

– Chill Multi decks

– Co2 mini plant

– Co2 leak detection

– Danfoss front end

– Danfoss network

– Freezer cold room Monoblock

– Multi plex

– Drainage

– Serve over cases

– Air-conditioing

– Tested, commissioned, validated and demonstrated

Recent Projects

Google Central Park Leopardstown

google logo

Crosbie Group won this project for Air-conditioning and Heat Recovery contract on a tender stage through main mechanical contractor,

Number of split systems across 8 storey office block servicing IDF and MDF rooms with 100 % and change over,

 

Scope

– Air-conditioning split system

– Ducted indoor units

– Drip pans

– Control wiring

– Condensate

– Leak detection

– Central controlled

– Heat Recovery

– BMS

– Tested, commissioned, validated and demonstrated

Recent Projects

Dunnes Stores Blanchardstown

dunnes logo

Crosbie Group were appointed the Refrigeration contract to De-commission and remove existing plant while store was still doing business during the day, installing new Glycol systems to reduce the sites carbon foot print. Six months of nights to keep the store trading while upgrading their new store.

 

– Glycol

– Chill multi decks

– Dry cooler

– Pump stations

– De-commission

– Refrigerant removal

– Carbon Pipe work

Recent Projects

Momentum support Head office Bluebell

project decoration

Crosbie Group won this CAT A project for Air-conditioning and Heat Recovery contract on a tender stage through main mechanical contractor,

Samsung VRF across ground and first floor along with heat recovery.

Scope

– Air-conditioning

– Ducted VRF units

– Control wiring

– Condensate

– Drip pans

– Leak detection

– Central controlled

– BMS

– Heat recovery

– Tested, commissioned, validated and demonstrated

Recent Projects

Blake Brothers Ltd

men working

Crosbie group were appointed the refrigeration and electrical upgrade contract, de-commission and remove R22 refrigerant, equipment and plant, upgrading new system with the latest technologies and refrigerant.

All works carried out with no down time for the client.

 

– Chill room

– Freezer Room

– Electrical

– Control wiring

– Condensate

– REM Network

– Leak detection

– Chill HT Plant

– Freezer LT Plant

– Tested, commissioned, validated and demonstrated

Recent Projects

Tala care Primary care centre

Recent Project Tala Care

Crosbie Group won this Air-conditioning contract at tender stage with Main Mechanical contract working with the HSE.

VRV Daikin systems on ground floor with comms rooms.

 

– VRV outdoor units

– Central control

– Ducted VRV indoor units

– Wall mount comms rooms

– Control wiring

– Condensate

– Tested, commissioned, validated and demonstrated

Recent Projects

OMNI Primary care centre (Beaumont )

hospital

Crosbie Group won this Air-conditioning and Ventilation contract direct with Beaumont TSD working directly with ARUP from a design stage with solutions for fresh air, heating and cooling

VRV Daikin systems on First floor with comms rooms.

 

– VRV outdoor units

– Central control

– VRV Daikin condenser

– VRV Daikin DX condenser

– Daikin AHU

– 600 x 600 cassette VRV indoor units

– Wall mount comms rooms

– Ductwork

– Lagging

– Ventilation

– Cladding

– Control wiring

– Condensate

– Tested, commissioned, validated and demonstrated

Recent Projects

Eden Gym One

project

Crosbie Group won this Air-conditioning contract at the tender stage with the main mechanical contractor, project insisted VRF Samsung systems across this state of the art gym.

 

– AHU

– Control wiring

– VRF indoor units

– VRF condensers

– Condensate

– Central control

– Pipework

– Dx outdoor unit

– Drip tray

– Tested, commissioned, validated and demonstrated

Recent Projects

Coombe Maternity Hospital

home decor

Crosbie Group won this Air-conditioning contract at the tender stage with the main mechanical contractor, project insisted De-commission and Removal of R22 system with an upgrade to R32 systems to reduce carbon footprint in the ICU Upgrade  .

 

 

– Control wiring

– Refrigerant removal

– Decommission

– Wall indoor units

– Split systems

– Condensate

– Central control

– Pipework

– Tested, commissioned, validated and demonstrated

Recent Projects

Clayton Hotel Leopardstown

Clayton hotel

Crosbie Group carried out the Air-conditioning upgrade contract to conference, meeting rooms and gym on hotel ground floor.

De-commissioned and removed R22 systems with upgrade to new VRF system all while the hotel was trading in live environment

 

 

– Refrigerant removal

– De-commission

– Pipework

– Condensate

– VRF indoor units

– Control wiring

– Central control

– Tested, commissioned, validated and demonstrated

Recent Projects

Beaumont Hospital

Beaumont hospital

Appoint directly by Beaumont TSD for the Air-conditioning installation to the new labs in Beaumont.

 

– Split systems

– Cassette

– Control wiring

– Condensate

– Pipework

– Tested, commissioned, validated and demonstrated

Recent Projects

Lidl Kildare town

logo

Air-conditioning contract with main mechanical contractor for new store with multiple Mitsubishi split  systems for warehouse area, VRF for office area.

 

– Splits system

– Comms room

– VRF

– Control wiring

– Condensate

– Piping

– Tested, commissioned, validated and demonstrated

Recent Projects

Hermitage

recent project image

Crosbie appointed directly by hospital to Design, Supply, Install and Commission a solution for swab, lab and pharmacy area to provide fresh air while heating and cooling.

 

– Ventilation

– Heat Recovery

– Control Wiring

– Dx coil

– Dx condenser

– Piping

– Condensate

– Tested, commissioned, validated and demonstrated